Steel-reinforced precast concrete wheel stops for public facilities, transit centers, and municipal parking. Complete technical documentation and bid-ready specifications. Manufacturing since 1978 with proven public sector experience.
Municipal and government facilities need durable parking infrastructure that serves the public for decades. You're accountable for taxpayer dollars and need to demonstrate value through reduced lifecycle costs and long-term performance. Complete technical documentation, engineer-signed drawings, and cylinder test reports are required for public procurement. Frequent replacement of failed wheel stops wastes public funds and creates ongoing maintenance burdens.
Complete specifications, CAD files, cylinder test reports, and engineer-signed drawings. Everything required for public sector procurement and plan review approvals.
OUTCOME: Faster procurement approvals, smoother plan reviews, reduced administrative burden.
One installation lasts 25+ years versus replacing rubber or plastic every 2–5 years. Dramatically lower total cost of ownership for public facilities — demonstrable value for taxpayers.
OUTCOME: Lower long-term maintenance costs, reduced replacement frequency, better use of public funds.
Manufacturing since 1978 with thousands of installations across California public facilities, transit centers, municipal parking, and government complexes.
OUTCOME: Confidence in supplier reliability and product performance for long-term public infrastructure.
| Model | Length | Height | Width | Weight | Rebar | Best For |
|---|---|---|---|---|---|---|
| CB04 | 4' (48") | 4" | 8" | ~130 lbs | #3 rebar | Compact spaces, residential |
| CB06 | 6' (72") | 4" | 8" | ~195 lbs | #3 rebar | Standard parking spaces |
| CB08 | 8' (96") | 4" | 8" | ~260 lbs | #3 rebar | Large spaces, high-traffic areas |
| TB04 | 4' (48") | 8" | 10" | 283 lbs | Four #4 | Smaller trucks, staging |
| TB06 | 6' (72") | 8" | 10" | 425 lbs | Four #4 | Standard truck parking, docks |
| TB06x12 | 6' (72") | 12" | 10" | 638 lbs | Four #4 | High visibility, tall clearance |
| TB08 | 8' (96") | 8" | 10" | 566 lbs | Four #4 | Loading dock positioning |
| TB08x12 | 8' (96") | 12" | 10" | 850 lbs | Four #4 | Heavy trucks, precise positioning |
| TB08 10x15 | 8' (96") | 10" | 15" | 1,100 lbs | Four #4 | Maximum durability, heavy loads |
"APC provided complete specifications and bid documentation that streamlined our public works procurement. Their engineer-signed drawings and cylinder test reports met all our compliance requirements. The 25+ year lifespan reduces our long-term maintenance costs significantly."
We respond within 1 business day with lead time and pricing.